I dug a gap 400mm deep and positioned Every submit into it. The submit was secured in position using a bag of premixed concrete undesirable that just desired water incorporating to it and no mixing and sets inside thirty minutes. I took care to make certain Every put up was buried the same depth, vertically amount and square with one another. The f